Project: Boeing UK 4 Bay Simulation Facility, Gatwick 

Brith Services Ltd carried out the mechanical installation within this new build commercial warehouse located by Gatwick airport. The facility is to house 4 simulators for training of pilots as part of the Boeing training scheme. The facility has offices, training classrooms, WC’s and small canteen located over two floors.


The building is heated and cooled via VRF (variable refrigerant flow) systems, chilled system, and small boiler plant and has AHU’s (air handling units) to circulate fresh air and extract stale air throughout.


There are two large chiller units located on the roof that were installed via a contract crane lift, these serve the two AHU’s within the simulator hall as well as the simulators. The chilled water is circulated via the pump room which also serve the two AHU’s located in the simulator hall to supply comfort cooling and heating, additional heating is generated by a boiler plant room also located in the simulator hall.


The installation aspects of this project were:


  • VRF air conditioning comfort cooling systems.
  • Chiller plant installation.
  • Chiller pump room.
  • Gas fired Boiler room.
  • Air handling units.
  • Cold mains installation.
  • Hot water electric heaters.
  • Building management system with head end computer.


The project was handed over in good time and Boeing UK are very pleased with the installation and service Brith Services provided, which has resulted in seasonal commissioning and maintenance being carried out as an extra contract placed direct with Boeing UK.

Job Value: 

Client:

Sector:

Services:

£900,000

Baxall Construction

Commercial

Full mechanical package

Registered Office: Crown House, 151 High Road, Loughton, Essex IG10 4LG


Registered in England No. 2850372 

VAT Registration No. 628 340 347

Copyright (c) Brith Services Ltd 2019

This website makes use of cookies. Please see our privacy policy for details.

OK