Project: St Paul’s School

Brith Services Ltd carried out the mechanical and electrical installation for the new general teaching block in two phases.


Phase 1 consisted of a large, new boiler plant room located on the roof with a large boosted water tank room and calorifier located at ground level, as well as AHU’s, VRF systems and heating provided by zone operated radiators and underfloor heating.  Electrically there was the complete wiring of all electrical supply, lighting, fire, access control, data, PA sound system, actuated windows and intruder alarm.

Phase 2 consisted of a new smaller calorifier room with AHU’s on the roof, VRF systems and heating also provided by zone operated radiators and underfloor heating which was a continuation of phase 1 LTHW.


The buildings facilitate new offices, meeting rooms, hall, classrooms, library, dining hall, staff changing rooms, tuck shop, toilets, a large atrium and children’s changing room with 20 infrared operated showers.


The installation aspects of this project were:

  • VRF air conditioning comfort cooling systems
  • Gas fired Boiler room
  • Air handling units
  • Cold mains and boosted water installation
  • Hot water calorifiers
  • Building management system with head end computer
  • UFH (Under floor heating)
  • Radiators
  • Fire alarm
  • Access control
  • Power and lighting
  • Disabled refuge
  • Data
  • Intruder alarm and CCTV
  • PA sound system
  • Lightning protection
  • Actuated windows




Job Value: 

Client:

Sector:

Services:


Osbourne

Registered Office: Crown House, 151 High Road, Loughton, Essex IG10 4LG


Registered in England No. 2850372 

VAT Registration No. 628 340 347

Copyright (c) Brith Services Ltd 2019

Registered Office: 2 Lakeview Stables, Lower St Clere, Kemsing, Sevenoaks, Kent, TN15 6NL


Registered in England No. 2850372 

VAT Registration No. 628 340 347

Copyright (c) Brith Services Ltd 2020

This website makes use of cookies. Please see our privacy policy for details.

OK